Rodrigues - Energy Generated (Period 01 July 2023 to 30 June 2024) | ||||||
---|---|---|---|---|---|---|
Power Station | Energy Source | Installed Capacity (kW) | Effective Capacity (kW) | Units Generated (kWh) | % Units Generated | |
1 | Port Mathurin P/S | Fuel Oil | 6,000 | 5,100 | 8,928,602 | 17.67% |
Solar | 50 | 50 | 44,729 | 0.09% | ||
2 | Pointe Monnier Power Station | Fuel Oil | 6,300 | 6,300 | 38,130,470 | 75.45% |
Solar | 35 | 35 | 54,393 | 0.11% | ||
3 | Trèfles Wind Farm | Wind | 120 | 120 | 135,000 | 0.26% |
4 | Grenade Wind Farm | Wind | 1,100 | 1,100 | 1,427,800 | 2.82% |
5 | Grenade Solar PV Plant | Solar | 1,000 | 1,000 | 1,029,630 | 2.04% |
6 | MSDG | Solar | 100 | 100 | 146,019 | 0.29% |
7 | SSDG | Solar | 596 | 596 | 643,395 | 1.27% |
TOTAL | 15,301 | 14,401 | 50,540,038 | 100.0% |
Maximum Power Demand
On 30 December 2023 at 19:12, the maximum power demand reached 8.52 MW, reflecting a 7.17% increase compared to 7.95 MW recorded in the 2022/2023 financial year.