At the CEB, we improve our electricity network by carefully planning power cuts. The power is off while our crews are working to make the network safe for you and your equipment.
We do our best to keep the outage time to a minimum and thank you for your patience while we know it is difficult to live without electricity in this busy world.
Despite the expected time for planned outages, the power can be restored slightly before or after the scheduled time depending on the site conditions.
Unplanned outages occur due to faults and are
beyond CEB’s control. Our crews are doing the best to speed up the repairs and
minimize the outage time. We’ll switch on the power, without further notice,
once the repairs are over.
| Date | Locality | Streets |
|---|---|---|
| Le dimanche 16 août 2026 de 08:30:00 à 15:00:00 | NASSOLA(RODRIGUES) | les habitant de Palissade, Nassola et Montagne Bois Noire |
| Le dimanche 16 août 2026 de 07:00:00 à 16:30:00 | FOND LA DIGUES(RODRIGUES) | les abonnés de Fond La Digue, Mont Fanal ainsi que ceux résidant aux environs du supermarché Le Grand Solitaire |
| Le dimanche 16 août 2026 de 15:30:00 à 16:30:00 | PORT MATHURIN(RODRIGUES) | Les Abonnes de Port Mathurin |
| Le dimanche 16 août 2026 de 06:00:00 à 07:00:00 | PORT MATHURIN(RODRIGUES) | les Abonnee de port Mathurin |