The Grid Code sets out all the requirements relevant to the performance, operation, testing, safety, and maintenance of distributed generation connected to CEB's low voltage (LV) network. Furthermore, it defines the rights,  responsibilities and conduct of all parties planning to assess the power system by producing electricity on renewable Small Scale Distributed Generators.

Download the Grid Code

MSDG Grid Code 50 - 200kW Version sept 2019

MSDG Grid Code 200kW - 2MW Version sept 2019